Data Cables

YP-C-120W-1- Fast Charging Charging & Data Cable with Universal Compatibility

  • Fast Charging
  • Universal Compatibility
  • Data Cable

Develop this model under your brand

Customization scope: Connector types, length, current rating, jacket material (PVC / TPE / silicone / braided nylon), colour, moulding design and packaging.

Request a Quote

Specifications

Specifications
MaterialTPE
Packing60 pcs / inner box, 360 pcs / master carton
Carton Size760*420*600

OEM / ODM options

  • Logo: silk screen, laser engraving or UV printing
  • Housing colour and finish matched to Pantone
  • Retail packaging artwork and manual design
  • Certification package for your target market
  • Firmware, app and user-manual branding

More in Data Cables

Frequently asked questions

What is the minimum order quantity for the YP-C-120W-1- Fast Charging Charging & Data Cable with Universal Compatibility?

Standard OEM orders of the YP-C-120W-1- Fast Charging Charging & Data Cable with Universal Compatibility start at 500 pcs per colour. Fully custom tooling programmes typically start at 3,000–5,000 pcs, and we confirm the number after reviewing the tooling investment with you.

Can the YP-C-120W-1- Fast Charging Charging & Data Cable with Universal Compatibility be customized with our logo and packaging?

Yes. Logo (silk screen, laser engraving or UV print), housing colour, Pantone matching, connector or cable specification, firmware and app branding and complete retail packaging — blister, gift box and manual artwork — are all customizable.

Which certifications can you provide for the YP-C-120W-1- Fast Charging Charging & Data Cable with Universal Compatibility?

CE, FCC, RoHS, REACH, UKCA, CCC, PSE and KC, plus UN38.3 and MSDS documentation for battery-powered models. We book testing with accredited third-party labs and hand over the full reports.

How long does an OEM project for the YP-C-120W-1- Fast Charging Charging & Data Cable with Universal Compatibility take?

Prototype samples in 7–15 days, tooling in 25–40 days, certification in 3–6 weeks depending on the target market, and mass production in 20–30 days after sample approval.

Related ranges