Wall Chargers

ZC-PD02 Fast Charging Wall Charger with Head Only

Model code: ZC-PD02
  • Fast Charging
  • Head Only
  • Charger

Develop this model under your brand

Customization scope: Output power, port configuration, plug type (US / EU / UK / foldable), GaN or silicon platform, housing colour, logo process and packaging.

Request a Quote

Specifications

Specifications
MaterialPC+ABSflame-retardant
Input180-240V~50/60HZ 0.5A
Output5V- 3A/9V-2.22A/12V-1.67A
Power20W
Packing32 pcs / inner box, 192 pcs / master carton
Carton Size760*420*600

OEM / ODM options

  • Logo: silk screen, laser engraving or UV printing
  • Housing colour and finish matched to Pantone
  • Retail packaging artwork and manual design
  • Certification package for your target market
  • Firmware, app and user-manual branding

More in Wall Chargers

Frequently asked questions

What is the minimum order quantity for the ZC-PD02 Fast Charging Wall Charger with Head Only?

Standard OEM orders of the ZC-PD02 Fast Charging Wall Charger with Head Only start at 500 pcs per colour. Fully custom tooling programmes typically start at 3,000–5,000 pcs, and we confirm the number after reviewing the tooling investment with you.

Can the ZC-PD02 Fast Charging Wall Charger with Head Only be customized with our logo and packaging?

Yes. Logo (silk screen, laser engraving or UV print), housing colour, Pantone matching, connector or cable specification, firmware and app branding and complete retail packaging — blister, gift box and manual artwork — are all customizable.

Which certifications can you provide for the ZC-PD02 Fast Charging Wall Charger with Head Only?

CE, FCC, RoHS, REACH, UKCA, CCC, PSE and KC, plus UN38.3 and MSDS documentation for battery-powered models. We book testing with accredited third-party labs and hand over the full reports.

How long does an OEM project for the ZC-PD02 Fast Charging Wall Charger with Head Only take?

Prototype samples in 7–15 days, tooling in 25–40 days, certification in 3–6 weeks depending on the target market, and mass production in 20–30 days after sample approval.

Related ranges