Wired Audio

ZE-E29 In-Ear All-Metal Wired Earphone & Audio Adapter with In-Line Control, Cable

Model code: ZE-E29
  • In-Ear
  • In-Line Control
  • All-Metal
  • Cable
  • Earphone

Develop this model under your brand

Customization scope: Connector type, cable jacket, driver tuning, in-line control functions, colour and packaging.

Request a Quote

Specifications

Specifications
Packing35 pcs / inner box, 210 pcs / master carton
Carton Size620*485*610

OEM / ODM options

  • Logo: silk screen, laser engraving or UV printing
  • Housing colour and finish matched to Pantone
  • Retail packaging artwork and manual design
  • Certification package for your target market
  • Firmware, app and user-manual branding

More in Wired Audio

Frequently asked questions

What is the minimum order quantity for the ZE-E29 In-Ear All-Metal Wired Earphone & Audio Adapter with In-Line Control, Cable?

Standard OEM orders of the ZE-E29 In-Ear All-Metal Wired Earphone & Audio Adapter with In-Line Control, Cable start at 500 pcs per colour. Fully custom tooling programmes typically start at 3,000–5,000 pcs, and we confirm the number after reviewing the tooling investment with you.

Can the ZE-E29 In-Ear All-Metal Wired Earphone & Audio Adapter with In-Line Control, Cable be customized with our logo and packaging?

Yes. Logo (silk screen, laser engraving or UV print), housing colour, Pantone matching, connector or cable specification, firmware and app branding and complete retail packaging — blister, gift box and manual artwork — are all customizable.

Which certifications can you provide for the ZE-E29 In-Ear All-Metal Wired Earphone & Audio Adapter with In-Line Control, Cable?

CE, FCC, RoHS, REACH, UKCA, CCC, PSE and KC, plus UN38.3 and MSDS documentation for battery-powered models. We book testing with accredited third-party labs and hand over the full reports.

How long does an OEM project for the ZE-E29 In-Ear All-Metal Wired Earphone & Audio Adapter with In-Line Control, Cable take?

Prototype samples in 7–15 days, tooling in 25–40 days, certification in 3–6 weeks depending on the target market, and mass production in 20–30 days after sample approval.

Related ranges